Bahen Centre for Information Technology: Difference between revisions

no edit summary
No edit summary
No edit summary
Line 19: Line 19:


}}
}}
The '''Bahen Centre for Information Technology''', located on 40 St. George Street, was completed in 2002 and serves as a "state of the art facility for education of information technology professionals in [[Electrical and Computer Engineering Department|electrical and computer engineering]], computer science and IT research." It was constructed at a cost of $111 million, and was designed by Diamond + Schmitt Architects Incorporated. The building is home to the [[Division of Engineering Science]] and is adjoined to a historical building (Koffler Center) that contains the Office of the Dean (and formerly the [[Professional Experience Year]] office).
The '''Bahen Centre for Information Technology''', located on 40 St. George Street, was completed in 2002 and serves as a "state of the art facility for education of information technology professionals in [[Electrical and Computer Engineering Department|electrical and computer engineering]], computer science and IT research." It was constructed at a cost of $111 million, and was designed by Diamond + Schmitt Architects Incorporated. The building is home to the [[Division of Engineering Science]] and is adjoined to the Koffler Centre on the south, which houses the U of T Bookstore and U of T Career Centre, and 44 St. George St. on the north, a historic house-like building that currently contains the Office of the Dean (and formerly the [[Professional Experience Year]] office).


==Departments and Offices==
==Departments and Offices==
Anonymous user