Engineering Science Grad Prank

The EngSci Grad Prank by the class of 0T9 and 0T8+PEY was a large-scale functional model of the game labyrinth that filled the entirety of the Sandford Fleming Building Atrium. It was constructed of 2x4 and masonite pieces, with four large handles on each side of the prank to control the labyrinth surface.

Construction

Destruction by MIE

Reconstruction