Myhal Centre for Engineering Innovation and Entrepreneurship: Difference between revisions

From Skulepedia
Jump to navigation Jump to search
fix year
Additional info from an APS111 lecture
Line 8: Line 8:


The '''Myhal Centre for Engineering Innovation and Entrepreneurship''' or '''Myhal''', was completed in 2018. Notoriously, it has no waterfountains and the elevators are always broken. Myhal includes a music room with poor acoustics and a fake grand piano.
The '''Myhal Centre for Engineering Innovation and Entrepreneurship''' or '''Myhal''', was completed in 2018. Notoriously, it has no waterfountains and the elevators are always broken. Myhal includes a music room with poor acoustics and a fake grand piano.
In an APS111 lecture in 2018, Professor Susan McCahan revealed that she had designed the concept for the building on a napkin.

Revision as of 14:55, 27 November 2021

Myhal Centre for Engineering Innovation and Entrepreneurship
Location 55 St. George Street
Year Constructed 2018
Building Code MY


The Myhal Centre for Engineering Innovation and Entrepreneurship or Myhal, was completed in 2018. Notoriously, it has no waterfountains and the elevators are always broken. Myhal includes a music room with poor acoustics and a fake grand piano.


In an APS111 lecture in 2018, Professor Susan McCahan revealed that she had designed the concept for the building on a napkin.