Galbraith Building: Difference between revisions

From Skulepedia
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
{{Infobox Building
|name = Galbraith Building
|image = Galbraith_Building.jpg
|alt = Galbraith Building
|caption =
|date = 1960
|location = 35 St. George Street
|office1 = [[Department of Civil Engineering]]
|office2 = Office of the Registrar
|office3 = First Year Office
|office4 = Engineering Outreach & Admissions Office
|office5 = Michael E. Charles Faculty Council Chamber
|office6 = Mark Huggins Structures Lab
}}
The '''Galbraith Building''', located on 35 St. George Street, was completed in 1960 as the Faculty of Applied Science and Engineering experienced a period of rapid expansion from the late 1940s to 1950s. It was constructed at a cost of $7 million, and was designed by Page and Steele architects (who later redesigned the interior of the [[Sandford Fleming Building]] after it was destroyed by a fire). It currently houses many of the Faculty's main operations, including the Registrar's Office, the First Year Office, and the Civil Engineering Department.
The '''Galbraith Building''', located on 35 St. George Street, was completed in 1960 as the Faculty of Applied Science and Engineering experienced a period of rapid expansion from the late 1940s to 1950s. It was constructed at a cost of $7 million, and was designed by Page and Steele architects (who later redesigned the interior of the [[Sandford Fleming Building]] after it was destroyed by a fire). It currently houses many of the Faculty's main operations, including the Registrar's Office, the First Year Office, and the Civil Engineering Department.



Revision as of 19:55, 6 February 2011

Galbraith Building
Galbraith Building
Location 35 St. George Street
Year Constructed ?
Major Offices/Labs
Department of Civil Engineering
Office of the Registrar
First Year Office
Engineering Outreach & Admissions Office
Michael E. Charles Faculty Council Chamber
Mark Huggins Structures Lab


The Galbraith Building, located on 35 St. George Street, was completed in 1960 as the Faculty of Applied Science and Engineering experienced a period of rapid expansion from the late 1940s to 1950s. It was constructed at a cost of $7 million, and was designed by Page and Steele architects (who later redesigned the interior of the Sandford Fleming Building after it was destroyed by a fire). It currently houses many of the Faculty's main operations, including the Registrar's Office, the First Year Office, and the Civil Engineering Department.

Departments and Offices

  • Office of the Registrar (GB157)
  • Admissions Office (GB153)
  • First Year Office (GB170)
  • Student Recruitment and Outreach Office (GB173)
  • Math Help Office
  • Office of Advancement, Alumni Relations (GB116)
  • Department of Civil Engineering (GB105)
  • Michael E. Charles Faculty Council Chamber (GB202)

Notable Laboratories

Structure

History