Galbraith Building: Difference between revisions

From Skulepedia
Jump to navigation Jump to search
Created page with "The '''Galbraith Building''', located on 35 St. George Street, was completed in 1960 as the Faculty of Applied Science and Engineering experienced a period of rapid expansion fro..."
 
No edit summary
Line 1: Line 1:
The '''Galbraith Building''', located on 35 St. George Street, was completed in 1960 as the Faculty of Applied Science and Engineering experienced a period of rapid expansion from the late 1940s to 1950s. It was constructed at a cost of $7 million, and was designed by Page and Steele architects (who later redesigned the interior of the Sandford Fleming Building after it was destroyed by a fire). It currently houses many of the Faculty's main operations, including the Registrar's Office, the First Year Office, and the Civil Engineering Department.
The '''Galbraith Building''', located on 35 St. George Street, was completed in 1960 as the Faculty of Applied Science and Engineering experienced a period of rapid expansion from the late 1940s to 1950s. It was constructed at a cost of $7 million, and was designed by Page and Steele architects (who later redesigned the interior of the [[Sandford Fleming Building]] after it was destroyed by a fire). It currently houses many of the Faculty's main operations, including the Registrar's Office, the First Year Office, and the Civil Engineering Department.


==Departments and Offices==
==Departments and Offices==

Revision as of 16:40, 6 February 2011

The Galbraith Building, located on 35 St. George Street, was completed in 1960 as the Faculty of Applied Science and Engineering experienced a period of rapid expansion from the late 1940s to 1950s. It was constructed at a cost of $7 million, and was designed by Page and Steele architects (who later redesigned the interior of the Sandford Fleming Building after it was destroyed by a fire). It currently houses many of the Faculty's main operations, including the Registrar's Office, the First Year Office, and the Civil Engineering Department.

Departments and Offices

  • Office of the Registrar (GB157)
  • Admissions Office (GB153)
  • First Year Office (GB170)
  • Student Recruitment and Outreach Office (GB173)
  • Math Help Office
  • Office of Advancement, Alumni Relations (GB116)
  • Department of Civil Engineering (GB105)
  • Michael E. Charles Faculty Council Chamber (GB202)

Notable Laboratories

Structure

History