Lassonde Mining Building: Difference between revisions

Jump to navigation Jump to search
(Mining Building)
 
Line 35: Line 35:
As the original SPS was administered by the province, it was left to the province to design and build the Mining Building, which initially was to be called the “Minerology and Geology Building”. The initial plan was to accommodate the growing interest in advanced education in mining, and to build a new science building to accommodate the Departments of Minerology, Geology, Metallurgy and Applied Chemistry (in the end, it was called the “Chemistry and Mining Building”).  The estimated cost was upwards of $200K, and both the location and design were the subjects of extensive discussion and debate.  The building came to represent much more than a science building; it was to play a role as a Toronto landmark.
As the original SPS was administered by the province, it was left to the province to design and build the Mining Building, which initially was to be called the “Minerology and Geology Building”. The initial plan was to accommodate the growing interest in advanced education in mining, and to build a new science building to accommodate the Departments of Minerology, Geology, Metallurgy and Applied Chemistry (in the end, it was called the “Chemistry and Mining Building”).  The estimated cost was upwards of $200K, and both the location and design were the subjects of extensive discussion and debate.  The building came to represent much more than a science building; it was to play a role as a Toronto landmark.


Before even an initial design was developed, a delegation traveled in search of the perfect building model, and visited other schools of metallurgy and mineralogy in Europe, Canada and the US.  Locations visited included Cornel, the University of Pennsylvania, the University of Philadelphia, and Columbia University.  The group included Premier Ross, the Hon. Mr. Harcourt, Minister of Education, Hon. F.R. Latchford, Minister of Public Works, Chief Architect F.R. Heakes and Dean Galbraith.
Before even an initial design was developed, a delegation traveled in search of the perfect building model, and visited other schools of metallurgy and mineralogy in Europe, Canada and the US.  Locations visited included Cornell, the University of Pennsylvania, the University of Philadelphia, and Columbia University.  The group included Premier Ross, the Hon. Mr. Harcourt, Minister of Education, Hon. F.R. Latchford, Minister of Public Works, Chief Architect F.R. Heakes and Dean Galbraith.


In the fall of 2010, the University, in partnership with the Faculty of Applied Science and Engineering, began a $20-million renovation project of the Mining Building. The project will convert previously unused attic space into the [[Civil Engineering Department]]'s Interdisciplinary Design Studio, a space that will be used primarily as a "home base" for the fourth-year Civil Engineering design projects.  In addition, the space will provide graduate student offices to accommodate graduate student expansion and a convergence area for researchers and industry to collaborate on joint projects. The space will be fully accessible via an interior elevator shaft to be added north of the West stairs. Several offices and labs of Civil Engineering, Mineral Engineering, Mechanical and Industrial Engineering, and IBBME have been displaced for the renovation, some of which will be moved permanently to accommodate the installation of the new elevator.
In the fall of 2010, the University, in partnership with the Faculty of Applied Science and Engineering, began a $20-million renovation project of the Mining Building. The project will convert previously unused attic space into the [[Civil Engineering Department]]'s Interdisciplinary Design Studio, a space that will be used primarily as a "home base" for the fourth-year Civil Engineering design projects.  In addition, the space will provide graduate student offices to accommodate graduate student expansion and a convergence area for researchers and industry to collaborate on joint projects. The space will be fully accessible via an interior elevator shaft to be added north of the West stairs. Several offices and labs of Civil Engineering, Mineral Engineering, Mechanical and Industrial Engineering, and IBBME have been displaced for the renovation, some of which will be moved permanently to accommodate the installation of the new elevator.