Editing Lassonde Mining Building
Jump to navigation
Jump to search
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 1: | Line 1: | ||
{{Infobox Building | {{Infobox Building | ||
|name = | |name = Mining Building | ||
|image = Mining Building.JPG | |image = Mining Building.JPG | ||
|alt = | |alt = Mining Building | ||
|caption = | |caption = | ||
|year = 1905 | |year = 1905 | ||
|location = | |location = 176 College Street | ||
|bldg_code = MB | |bldg_code = MB | ||
|architects = Francis Riley Heakes and Frank Darling | |architects = Francis Riley Heakes and Frank Darling | ||
|office1 = [[Lassonde Mineral Engineering Program]] | |office1 = [[Lassonde Mineral Engineering Program]] | ||
|office2 = Lassonde Institute for Engineering Geoscience | |office2 = Lassonde Institute for Engineering Geoscience | ||
|office3 = Institute for Biomaterials and Biomedical Engineering | |office3 = Institute for Biomaterials and Biomedical Engineering | ||
}} | }} | ||
The ''' | The '''Mining Building''' at 176 College Street is one of the original buildings of the [[School of Practical Science]]. Completed in 1905, the Mining Building was designed by Mr. Francis Riley Heakes and Mr. Frank Darling, Chief Architects of the Public Works Department. The final cost of the building at its completion was $384,736. The building is designated as a Heritage Property for its importance as a major work of Edwardian Classicism. | ||
In | In 2010, the building began a $20-million renovation project to convert previously unusable attic space into an interdisciplinary design studio. | ||
==Departments and Offices== | ==Departments and Offices== | ||
Line 26: | Line 26: | ||
==Notable Laboratories== | ==Notable Laboratories== | ||
* Lassonde Institute for Engineering Geoscience | * Lassonde Institute for Engineering Geoscience | ||
[[image:Mining_Building_Front.png|400px|thumb|left|Artist's rendering of the front facade of the Mining Building]] | |||
==Structure== | |||
The Mining building was originally to be a 4-storey structure made of stone and pressed brick. There were to be two wings extending north from the west and east side of the building, enclosing a quadrangle which was to be used as a milling room. Tenders, when received, indicated that the initial building plans were too extravagant – the wings were cut and the design reassessed. | |||
==History== | ==History== | ||
Line 32: | Line 36: | ||
As the original SPS was administered by the province, it was left to the province to design and build the Mining Building, which initially was to be called the “Minerology and Geology Building”. The initial plan was to accommodate the growing interest in advanced education in mining, and to build a new science building to accommodate the Departments of Minerology, Geology, Metallurgy and Applied Chemistry (in the end, it was called the “Chemistry and Mining Building”). The estimated cost was upwards of $200K, and both the location and design were the subjects of extensive discussion and debate. The building came to represent much more than a science building; it was to play a role as a Toronto landmark. | As the original SPS was administered by the province, it was left to the province to design and build the Mining Building, which initially was to be called the “Minerology and Geology Building”. The initial plan was to accommodate the growing interest in advanced education in mining, and to build a new science building to accommodate the Departments of Minerology, Geology, Metallurgy and Applied Chemistry (in the end, it was called the “Chemistry and Mining Building”). The estimated cost was upwards of $200K, and both the location and design were the subjects of extensive discussion and debate. The building came to represent much more than a science building; it was to play a role as a Toronto landmark. | ||
Before even an initial design was developed, a delegation traveled in search of the perfect building model, and visited other schools of metallurgy and mineralogy in Europe, Canada and the US. Locations visited included Cornell, the University of Pennsylvania, the University of Philadelphia, and Columbia University. The group included Premier Ross, the Hon. Mr. Harcourt, Minister of Education, Hon. F.R. Latchford, Minister of Public Works, Chief Architect F.R. Heakes and Dean Galbraith. | Before even an initial design was developed, a delegation traveled in search of the perfect building model, and visited other schools of metallurgy and mineralogy in Europe, Canada and the US. Locations visited included Cornell, the University of Pennsylvania, the University of Philadelphia, and Columbia University. The group included Premier Ross, the Hon. Mr. Harcourt, Minister of Education, Hon. F.R. Latchford, Minister of Public Works, Chief Architect F.R. Heakes and Dean Galbraith. | ||
===2011 Attic Expansion=== | |||
= | |||
==2011 Attic Expansion== | |||
In the fall of 2010, the University, in partnership with the Faculty of Applied Science and Engineering, began a $20-million renovation project of the Mining Building. The project converted previously unused attic space into the [[Civil Engineering Department]]'s Interdisciplinary Design Studio, a space that will be used primarily as a "home base" for the fourth-year Civil Engineering design projects. The additional space on the fourth and fifth floors, named the Goldcorp Mining Innovation Suite, provides 100 workstations for students in the mineral and civil engineering programs. | In the fall of 2010, the University, in partnership with the Faculty of Applied Science and Engineering, began a $20-million renovation project of the Mining Building. The project converted previously unused attic space into the [[Civil Engineering Department]]'s Interdisciplinary Design Studio, a space that will be used primarily as a "home base" for the fourth-year Civil Engineering design projects. The additional space on the fourth and fifth floors, named the Goldcorp Mining Innovation Suite, provides 100 workstations for students in the mineral and civil engineering programs. | ||