Editing Bahen Centre for Information Technology
Jump to navigation
Jump to search
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 32: | Line 32: | ||
* Emerging Communications Technology Institute | * Emerging Communications Technology Institute | ||
* Reconfigurable Antennas Laboratory (BA8177) | * Reconfigurable Antennas Laboratory (BA8177) | ||
==Structure and Design== | ==Structure and Design== | ||
Line 43: | Line 42: | ||
The facility contains 50 laboratories, 10 lecture theatres, 13 tutorial rooms, 9 seminar rooms, and about 300 offices. The building was officially opened on October 8, 2002, after opening in the summer of 2002. The sixth floor, however, was finished only in August 2005 and the Department of Mathematics (and the Mathematics Library) moved in. | The facility contains 50 laboratories, 10 lecture theatres, 13 tutorial rooms, 9 seminar rooms, and about 300 offices. The building was officially opened on October 8, 2002, after opening in the summer of 2002. The sixth floor, however, was finished only in August 2005 and the Department of Mathematics (and the Mathematics Library) moved in. | ||
==Awards and Accolades== | ==Awards and Accolades== |