Editing 2009-2010
Jump to navigation
Jump to search
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 2: | Line 2: | ||
===Atrium Renovation Project=== | ===Atrium Renovation Project=== | ||
''See also: [[Atrium Renovation Project]] | ''See also: [[Atrium Renovation Project]] | ||
Following over 5 years of revisions and delays, the Atrium in the basement of the Sandford Fleming Building was renovated with new seating and tables, new lighting, as well as a new ceiling. This followed the renovation of the food services outlet for the [[Hard Hat Cafe]] the previous year. | Following over 5 years of revisions and delays, the Atrium in the basement of the Sandford Fleming Building was renovated with new seating and tables, new lighting, as well as a new ceiling. This followed the renovation of the food services outlet for the [[Hard Hat Cafe]] the previous year. | ||
Line 120: | Line 119: | ||
|gc1 = Ryan Campbell | |gc1 = Ryan Campbell | ||
}} | }} | ||
==Conferences Hosted== | ==Conferences Hosted== | ||
[http://www.ncwie.skule.ca National Conference on Women in Engineering 2009] | [http://www.ncwie.skule.ca National Conference on Women in Engineering 2009] |